Skip to content

Managing Storage

The Storage window shows what your workspace stores, what that costs against your plan, and which projects and tables use the space. Each project’s Tables tab also shows what each table stores, and its Storage button opens a window where you set how long each table keeps its history.

On the Projects screen, the storage strip shows how much your workspace stores. Click Storage details… to open the Storage window. Click Refresh to reload it.

Storage this month shows a meter with three bands:

Band Meaning
Included Storage your plan includes.
Reserved Storage your organization has reserved ahead of time.
On-demand Storage beyond what is included and reserved.

Below the meter, cards show:

  • Stored now — what the workspace stores today.
  • Projected average — your average for the month so far, with the latest day carried to the end of the month. This is the figure billing uses, not Stored now. A day when you store a lot more briefly does not set your bill.
  • Included, Covered by reserved and On-demand — how the projected average divides across the bands.

Last 90 days charts daily storage for the workspace.

Workspace admins also see estimated dollar amounts, such as the cost of the on-demand band, and a suggestion when reserving more storage would save money. Other members see sizes only. Dollar amounts are estimates, not an invoice.

Workspace admins can enter an amount in What if you delete data? to see how much this month’s average falls and about how much it saves. The estimate assumes the space is released a few days from now, because cleanup runs nightly.

The Projects list in the Storage window splits each project’s size into:

  • Current (GB) — the data in your tables now.
  • History (GB) — older versions kept for time travel and restores.
  • Total (GB) — the two together.
  • 30-day (%) — how much the project’s storage changed over the last 30 days.

Some billed storage belongs to no project, so it appears on its own rows marked Billed overhead:

  • Backups
  • Files and documents
  • Container images
  • Workflow scratch space and copies
  • Deleted tables awaiting cleanup — storage from tables you deleted that is still being held before it is released. It counts toward your total until cleanup completes, then drops out.
  • Metadata, cleanup and unmeasured

Other projects totals the projects you can’t open.

On the Projects screen, the Size column shows each project’s storage, and folders show the total of the projects inside them.

Storage is part of a project’s Tables tab. The Tables list shows how much the project stores, split into current data and history, with these columns beside each table’s name:

Column Meaning
Current data What the table holds now.
History Older versions kept so you can restore them.
Time Travel Days The table’s own setting. 1 means the table uses the project’s default, so it can keep more history than the number shows. The table’s settings window shows the days actually kept and the oldest point you can restore to.
Note Estimated, Not measured or Being cleaned up.

Choose Storage from the Actions menu on Tables to open the Storage window, which also shows the table sizes, rows and when each table was last written. You need read access to the project.

Above the table, the window suggests the easiest savings: a table that hasn’t changed in over 90 days, a table in a trashed project, or a table whose history is larger than its data. Each suggestion has Open table, and Delete… or Time travel… when you can edit the project.

Every write to a table keeps the table’s earlier version. That older data is its history. Time travel is how long a table keeps it, and it decides how far back you can view or restore a table.

New projects keep 1 day of history by default. You control the setting at two levels:

  • Project default. In the project’s settings, Default Time Travel Retention (Days) is a number from 1 to 90. It applies to every table that doesn’t set its own.
  • Table. In the table’s settings, Time Travel is Inherit (use the project default) or one of 2, 3, 5, 7, 14, 30, 60 or 90 days.

A table’s own setting only takes effect when it is longer than the project default, so a table can lengthen its project’s default but not shorten it. To keep less history on one table, lower the project default.

Changes take effect at the next nightly cleanup. Raising a setting keeps history from then on. It can’t bring back history that has already expired, and the table’s settings window says so when you raise it.

A table’s restorable range is the number of days it keeps, and its settings window shows the oldest point you can restore to. Restoring to a point in time works back to that oldest restorable point.

After its time-travel period ends, deleted data stays recoverable by PlaidCloud support for 7 more days. It doesn’t count toward your storage.

  • Delete or trash data you don’t need. Use Delete… on a suggestion, or delete tables and projects you no longer use.
  • Lower the project’s default time travel. Tables set to Inherit then keep less history.
  • Shorten a table’s own time travel, for a table you lengthened earlier.
  • Review the suggestions in each project’s Storage window.

Space is released gradually over the next few days as nightly cleanup runs.

Project and table sizes reflect what is actually stored, history included. A project’s Data size on Project Home shows the same total as its Size on the Projects screen. Each night, history older than a table’s time-travel setting is cleaned up, so a project that has kept a long history sees its usage fall over the following days rather than all at once.

  • Estimated means PlaidCloud hasn’t yet measured the table or project. Sizes are estimated from the table’s shape until the nightly measurement runs.
  • Snowflake and Databricks projects keep their data in your own account. They show an estimated size and never count toward your PlaidCloud storage.
  • Workspace total unavailable means the total for the workspace couldn’t be read just now. Project sizes are shown as estimates. Click Refresh to try again.
  • If you see You don’t have access to storage usage, ask a workspace admin for read access to projects.